SG Highway Corporate Hub

Area

8,000 sqft

Location

SG Highway, Ahmedabad

Capacity

70+ Hybrid Workstations

THE STORY.

Concept design. This is a design concept by Purn Interiors showing how we would approach a corporate office in SG Highway. It is not a completed client project, and the images are representative visuals. For completed work, see our project portfolio on Behance.

The Corporate Brief: Scalable Workplace on SG Highway

Situated within a prominent Grade-A commercial complex on SG Highway, Ahmedabad, this expansive 8,000 sq.ft. commercial floor plate is designed as a concept for a fast-growing fintech firm. The brief calls for a dynamic headquarters capable of accommodating 70+ hybrid knowledge workers, 3 high-tech client conference suites, an informal wellness cafeteria, and soundproof private phone pods.

Commercial Space Optimization & MEP Engineering

Commercial projects of this magnitude necessitate stringent adherence to fire safety codes, HVAC balance, and electrical redundancy:

  1. Exposed Industrial Ceiling & Acoustic Geometry: To maximize interior ceiling height, structural slab soffits were painted matte obsidian black, while HVAC spiral ducts and cable trays were laser-aligned. Acoustic performance was maintained by suspending perforated acoustic wood tiles and sound-absorbing baffle clouds above open desk banks.
  2. Modular Executive Boardrooms: Equipped with motorized acoustic folding walls that allow two 12-seater conference rooms to combine into a single 28-person town-hall auditorium within 90 seconds.
  3. Ergonomic Workstation Architecture: Height-adjustable sit-to-stand motorized desks paired with BIFMA-certified ergonomic mesh task chairs and dual-monitor gas-strut arms.

Biophilic Social Breakout Zone

  • The Oasis Cafe: Incorporates a 24-foot live vertical green wall with automated drip irrigation, reclaimed pine communal cafe tables, and barista-grade espresso counters.
  • Smart Access & Energy Management: Microprocessor-controlled occupancy sensors and DALI-automated LED lighting fixtures reduced the office's overall HVAC and lighting power consumption by an estimated 28%.

Turnkey Delivery Execution

A floor plate of this size would typically need a 75-day fast-track schedule, including full AHU (Air Handling Unit) installation, statutory compliance clearances, and certified CAT-6A data cabling.